LG AJU75152601 Washer Water Inlet Valve Assembly

Special Price $67.48 Regular Price $117.26
In stock
Available Quantity:   46
SKU
AJU75152601

Product Description

The LG AJU75152601 Washer-Water Inlet Valve Assembly is responsible for the constant and proper flow of water to the washer to enable the function properly. This controls the flow of the cold and hot water making sure that the right amount of water is used for washing. It operates through the control of solenoid valves and controls the admission of water into the drum of the washer.
Manufacturer
✓ This Product Replaces: AJU75152603
https://www.hnkparts.com/media/catalog/product/a/j/aju75152601-63109.jpg
Manufacturer Name: LGE
Product Number: AJU75152601
OEM Part Number: AJU75152601
Product Description: Valve Assy-Inlet

Choose the best Home Appliance parts and supplies from HnKParts!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)723-0907 or [email protected]

Write Your Own Review
You're reviewing:LG AJU75152601 Washer Water Inlet Valve Assembly
Your Rating
Customer Questions
What maintenance is required for the LG AJU75152601 Water Inlet Valve Assembly?

Regularly inspect the washer valve for mineral buildup, debris, or clogging in the inlet screens. Clean the filters gently to ensure proper water flow. Check for leaks or loose connections. Turn off water supply before servicing for safety.

What are common issues with the LG AJU75152601 Water Inlet Valve Assembly?

  • Restricted water flow due to clogged inlet screens.
  • Valve failing to open or close properly.
  • Water leaking from connections or housing.
  • Inconsistent or no water filling during cycles.

Installation Steps

Step1: Disconnect washer power and water supply to prevent electric shock or leaks.

Step2: Remove top panel of washer using the proper tool and locate old inlet valve.

Step3: Detach water hoses and electrical connectors carefully noting positions.

Step4: Install new valve and reconnect hoses and wiring securely.

Step5: Reassemble panel restore water and power and test for leaks.